Bengaluru Metro Double-Decker Road Plan Fails IISc Test: Report
The technical report, prepared by Prof. Ashish Verma of IISc, estimates the Economic Internal Rate of Return (EIRR) for Phase 3 at just 9.07 per cent when the double-decker road component is included, well below the accepted benchmark of 14 per cent.



