The HinduLean L·
Unpaid traffic fines of ₹49,194.05 crore can fund Ganga Expressway
The estimated cost of Phase 1 of the Ganga Expressway, spanning 594 km, was ₹36,230 crore
Read at The Hindu →
The estimated cost of Phase 1 of the Ganga Expressway, spanning 594 km, was ₹36,230 crore
<iframe src="https://hindustansphere.com/embed/cluster/baa5ccd4732c2af049984afd059662aa666d6944" width="100%" height="320" style="border:0;max-width:680px" loading="lazy" title="Unpaid traffic fines of ₹49,194.05 crore can fund Ganga Expressway"></iframe>