The HinduLean L·
Newly built approach road to bridge caves in after heavy rains in Dehradun
The repaired bridge and the newly constructed approach road were built at a combined cost of ₹16 crore
Read at The Hindu →
The repaired bridge and the newly constructed approach road were built at a combined cost of ₹16 crore

<iframe src="https://hindustansphere.com/embed/cluster/ba8d0882e3ea5a31dde089fdc5b6c938c159b3ab" width="100%" height="320" style="border:0;max-width:680px" loading="lazy" title="Newly built approach road to bridge caves in after heavy rains in Dehradun"></iframe>