The HinduLean L·
Four years after fund allocation, a motorable road not yet a reality in Edamalakkudy
A 1.35-km section of the first phase (Pettimudy to Edaliparakkudy) is yet to be finished
Read at The Hindu →
A 1.35-km section of the first phase (Pettimudy to Edaliparakkudy) is yet to be finished
<iframe src="https://hindustansphere.com/embed/cluster/7868942b5beefe586357a54f1ef20f3ea5c08715" width="100%" height="320" style="border:0;max-width:680px" loading="lazy" title="Four years after fund allocation, a motorable road not yet a reality in Edamalakkudy"></iframe>