NDTVCenter·
Power Supply Disruption: PGCIL Test Triggers Electrical Fault, Halting NTPC Korba Operations
With four 500 MW units and three 200 MW units, the NTPC Korba facility has an installed capacity of about 2,600 MW.
Read at NDTV →
With four 500 MW units and three 200 MW units, the NTPC Korba facility has an installed capacity of about 2,600 MW.

<iframe src="https://hindustansphere.com/embed/cluster/56e3fd045237057bbaeff803833fce50b0c5c798" width="100%" height="320" style="border:0;max-width:680px" loading="lazy" title="Power Supply Disruption: PGCIL Test Triggers Electrical Fault, Halting NTPC Korba Operations"></iframe>